Normal Time = Observed Time × (Rating Factor / 100)
Standard Time = Normal Time × (1 + Allowance / 100)
Work Elements
OUTPUT
| Element |
Obs. Times |
Mean (s) |
Normal Time (s) |
Std Time (s) |
Cycle Time = Production Time / Required Output | Min Stations = Σ Task Times / Cycle Time
Efficiency = (Σ Task Times) / (N × Cycle Time) × 100 | Balance Delay = 100 − Efficiency
Tasks / Operations
OUTPUT
| Task |
Time (min) |
% of Cycle |
Status |
Annual Value = Annual Usage × Unit Cost
Class A = Top items contributing ~70% of total value |
B = Next ~20% |
C = Remaining ~10%
// Format: Name, Quantity, Unit Cost — one item per line
OUTPUT
| Rank |
Item |
Annual Usage |
Unit Cost |
Annual Value |
% of Total |
Cumulative % |
Class |